Negotiable
The date of payment from buyers deliver within days
Jiangsu
Long-term effective
2017-10-04 11:51
40
Company Profile
Suzhou Forstec Machinery Co., Ltd.By certification [File Integrity]
Contact:Mrs. Jasmine(Mr.)
Email:
Telephone:
Phone:
Area:Jiangsu
Address:Jiangsu
1). Instruction for Installation and Debugging
Before delivery, FORSTEC takes responsible for debugging of machine, in order to make sure the provided machine could be safely and smoothly put into operation.
FORSTEC also take responsibility to have debugging overseas, and Client abroad please sends invitation forward of time to engineer of FORSTEC, provides the engineer with round-trip tickets, accommodation, vehicle and $55 per day salary.
2). User Training
Before delivery, FORSTEC will take responsibility to indoctrinate technical training to the users so that they could understand the machine features and could operate the machine by themselves.
3). Warranty Period
The warranty period for FORSTEC machine is one year with a life long maintenance. If the user requires special quality guarantee, other stipulated warranty period may be made after mutual agreement.
6.Main parameters for this High Quality 200L Drum Blow Molding Machine/Extrusion Blow Molding Machine/Plastic Drum Extrusion Machine(FSC200-230L):
extruder | ||
1 | Screw diameter | 120mm |
2 | L/D ratio | 30:1 |
3 | Screw speed | 15-50r.p.m. |
4 | Drive motor | DC 132Kw |
5 | DC drive motor controller | Eurotherm U.K. |
6 | Heating zone with cooling fan | 5 zones |
7 | Output/Throughout | 240Kg/hr(HDPE particle) |
8 | Heating capacity | 47.4 kw |
9 | Vertical adjustment of head | 500mm |
10 | Forward/Backward adjustment of head | 600mm |
11 | Groove feed barrel cylinder | Have IKV |
12 | Gear box | Hard gear decelerator |
13 | Ladder and safety rails | fixed |
DIE HEAD | ||
1 | Accumulator capacity | 20L(15kgHDPE) |
2 | Design | First in and first out |
3 | Heating zone | 5 zones |
4 | Heating capacity | 38kw |
5 | Max die&pin diameter | 500mm |
6 | Die head axis with pre-blow | 100mm |
7 | Accumulator push-out stroke measurement | Transducer Italy Gefran |
8 | Injection pressure | 12Mpa |
9 | Extruder stop | Have |
CLAMPING UNIT | ||
1 | Tie bar | Two tie bar |
2 | Platen size | 1200(W)X1300(H) |
3 | thickness of mold | 650-750mm |
4 | Clamping force | 800KN |
5 | Close/Open stroke | 800-1700mm |
6 | size of mold | 1200×1300mm |
7 | Clamping stroke measurement | Proximal sensor from TAIWAN |
8 | Hydraulic valve | Taiwan Haitack |
9 | Number of hydraulic cylinder | 1 |
10 | High pressure | 14mpa |
11 | Support parts for platen movement | Liner Guide |
HYDRAULIC SYSTEM | ||
1 | Drive motor | AC 45Kw |
2 | Hydraulic valve | Taiwan |
3 | Hydraulic pump | Taiwan |
4 | Connector\Tuber | Japan |
5 | Seal | Japan |
6 | Oil tank capacity | 850L |
7 | Operating pressure | 14mpa |
8 | Cooling water for oil | fixed |
9 | Control of oil level & temperature | Checking oil temperature and abnormal alert be observed dipstick |